9 Bay Examination Hall for St Thomas the Apostle College, Southwark.  Having previously worked for the college we were their point of call when they required a new Hall for use as both an examination hall or a recreation hall for when no exams were taking place. We raised the internal ceiling height to 3m to accommodate the schools needs, we also did foundations and provided Powder Coated steps and ramps for accessibility.  The exterior of the building was finished in a mixture of Clad-Ex Plastisol and Thermowood along with Anthracite windows to comply with Planning Conditions.  The overall size of the building was 27.9m x 12.5m and was manufactured and installed within the summer holiday period of 7 weeks.

×