The three buildings were designed to fit into the training ground setting with a mixture of wood and steel.
First team changing rooms had to be bespoke to Charlton requirements with a lot of time spent in design before manufacture. The canteen and classroom were critical to accommodate the large volumes of people using the facility.
The end result was a success.